Cart
  • Free Shipping on all orders in Australia
  • Over 7 million books in stock
  • Proud to be B-Corp
  • We aim to be carbon neutral by 2022
  • Over 120,000 Trustpilot reviews
Item 1 of 0
Critical Path Analysis And Other Project Network Techniques By Keith Lockyer

Critical Path Analysis And Other Project Network Techniques by Keith Lockyer

Condition - Very Good
$16.99
Only 3 left

Summary

Intended for those who wish to assess the value of project network techniques (PNT) in dealing with their own problems and for those who wish to put the technique into practice. This revised edition contains more details on the control of cash, line of balance and with additional new items.

Critical Path Analysis And Other Project Network Techniques Summary

Critical Path Analysis And Other Project Network Techniques by Keith Lockyer

This text is intended for those who wish to assess the value of project network techniques (PNT) in dealing with their own problems and for those who wish to put the technique into practice. This revised edition discusses resource analysis and contains a chapter on practical considerations which has been prepared setting out day-to-day practice which the authors have found useful. In addition the chapter on control of cash has been amplified and the line of balance chapter now includes discussion of the elemental trend analysis technique. The Solutions Manual has been converted into a lecturer's manual whose purpose is to help tutors by reducing the time taken in the drawing of networks. The manual contains A4-size drawings of the key diagrams in the text and all the answers to the quesitons.

Table of Contents

The elements of an activity-on-arrow network - I general and II dummies; activity-on-node networking; drawing the network; analyzing the activity-on-arrow network - I isolating the critical pathe and II float or slack; ladder activities; analyzing the activity-on-node networ; the network and bar chart; precedience networks - multiple dependency AoN; reducing the project time; resource analysis; control and project management techniques; cash as a resource; line of balance; some practical considerations.

Additional information

GOR001418682
9780273034162
0273034162
Critical Path Analysis And Other Project Network Techniques by Keith Lockyer
Used - Very Good
Paperback
Pearson Education Limited
1991-04-30
256
N/A
Book picture is for illustrative purposes only, actual binding, cover or edition may vary.
This is a used book - there is no escaping the fact it has been read by someone else and it will show signs of wear and previous use. Overall we expect it to be in very good condition, but if you are not entirely satisfied please get in touch with us

Customer Reviews - Critical Path Analysis And Other Project Network Techniques